Shopping cart

close

INSTALLED:

2020

BRIDGE:

20M Concrete Deck Weighbridge

LOCATION:

Wangaratta
VIC

Description:

  • New recycling yard weighbridge for the local council.
  • Full turnkey project starting with assisting the customer to choose weighbridge location and positioning in suitable soil, completion of all civils and concreting through to final commissioning. 
  • Installed with a basic weight indicator that was integrated into their new waste software.
  • Work with another contractor to integrate boom gates and end sensors.

Electronics:

  • Rice Lake RL5416 Load Cells
  • Rice Lake 480 Indicator
  • Anyload 808AH LED Remote Display