WEIGHBRIDGE:

Above Ground Weighbridge

DECK:

40M Concrete Deck

LOCATION:

Walgett
NSW

Description :

  • This installation was a last-minute run leading into the 2024 harvest with only 6 weeks to deliver!
  • A 40m Australian Made weighbridge was delivered to the site and built on a pre-poured slab, completed by the customer.
  • Return trip just before the big harvest kicked off to lift the decks and commission.
  • Big effort from the team on this one being over 800km from Albury!

Electronics:

  • 16 x Marques 30t Load Cells
  • 1 x Dini 3590 Indicator
  • Anyload Remote Displays x 2
  • 2 x Anyload Remote Displays