Shopping cart

close

WEIGHBRIDGE:

Above Ground Weighbridge

DECK:

28M Concrete Deck

LOCATION:

Pyramid Hill
VIC

Description:

  • Quarry B Double weighbridge
  • Replaced old 24m weighbridge that was structurally unsound
  • Installed full lightening protection with load cell protectors and earth stakes at each load cell

Electronics:

  • Rice Lake 30t Load Cells
  • Rice Lake 880 Stainless Steel Indicator