fbpx

Shopping cart

close

WEIGHBRIDGE:

Above Ground Weighbridge

DECK:

40M Road Train
Concrete Deck

LOCATION:

Jerilderie
NSW

Description :

  • New Road Train Weighbridge next to the existing 25-year-old weighbridge.
  • The full turnkey project included soil testing, completing all civils and concreting through to final commissioning.
  • Installed with a basic weight indicator that was integrated into their Grain Storage software.
  •  Supply and install 2 x aluminium safety walkways for truck driver vehicle exiting.
  • The main grain sample stand was relocated to a central location between the existing and new weighbridge.

Electronics:

  • 16 x Rice Lake RL5416 Load Cells
  • Dini Argeo 3590EGT8 Indicator
  • Anyload 808BH LED Remote Display with built-in traffic lights

Extras Accessories:

  • Driver walkways and platform
  • Fully Galvanized remote display pole